DRAFTING & DOCUMENTATION · MELBOURNE
Plans of what is already there.
Record an existing layout, update an old drawing or show how a proposed change relates to the building on site.
Discuss Your Drawing RequirementsChoose the right starting information
Old plans, photographs and measurements can each help describe a property, but they do not always tell the same story. A previous renovation may not appear on the drawing, and a photo may not establish dimensions or levels.
We review the material available and discuss what needs to be checked or obtained before agreeing the drawing package. Site measurement, surveying and specialist investigations are scoped separately as required.
Typical drafting tasks
- Redraw a legible existing floor plan in a consistent drawing format
- Update layouts to reflect verified changes
- Prepare existing elevations or sections where suitable information is available
- Show existing and proposed layouts together for a defined purpose
Tell us how the drawings will be used
A record for an initial renovation discussion is different from a set of drawings requested by a building surveyor. Share the intended use and any written requirements so the level of detail can be agreed.
Existing-building drawings record the information available for the agreed scope. They do not certify concealed construction, boundary positions, structural adequacy or approval status.
Prepare your enquiry
- Property suburb and a description of the building
- Existing plans, including their date and any known inaccuracies
- Current photos showing the relevant spaces or structure
- The written request for drawings, if one has been issued
- Confirmation that you have permission to use the supplied documents
Questions about this service
Can you work from a PDF or a paper plan?
Yes, we can review a clear copy. Its scale, dimensions, completeness and legibility affect whether it can be used directly or needs redrawing and further checking.
Is this the same as an as-built certification?
No. Recording an existing building is not certification that the work complies with an approval or construction standard.